


Beautiful 14th-century civil engineering work, dated 1319, 1869.
A parchment from 1319, deciphered in 1679, mentions the bridge's construction.
The Viueux Pont de Serviers underwent repairs in 1869 when the town hall was built.
The bridge underwent repairs in 1869, as evidenced by plans drawn up to level the street when the town hall was built.
The two-arched bridge is built of regularly coursed shell limestone. The arches meet in a central buttress, which is marked on the north side due to flooding.
Free access.
Destination Pays d'Uzès Pont du Gard - 27/07/2026
Collaboration withDépartement du Gard
www.uzes-pontdugard.com
Report a problem
Phone : 04 66 22 68 88
Email : info@uzes-pontdugard.com