In the summer of 1943 began the construction of a fourth block on the base. It is motivated by the upcoming commissioning of a new generation of submarines, the XXI type U-boats, much more efficient in diving. They gain autonomy and power, but their dimensions no longer allow them to access the existing slipway. Hoisted using a vertical elevator overlooking the large basin of the fishing port, they were then to be distributed in blocks K4a and built as an extension of the previous ones. Keroman 4 was planned to house twenty-four submarines. But the Allied bombings are intensifying, hindering the supply of material. Manpower is becoming scarce and is used primarily for the work on the Atlantic wall. The construction site was interrupted in April 1944, leaving in situ only this wall and some vestiges, witnesses of the gigantic project planned on the site.