Built from October 1941 to January 1943, the Keroman 3 block is the largest on the base. Its roof, which can reach nearly 7 meters in thickness, protects three floating basins and four dry repair basins. To protect against increasingly powerful allied air raids, the roof is thus composed of a layer of concrete on which galleries open at both ends are arranged. These allowed the dispersion of the blast of the bombs to avoid damaging the bunker. Anti-aircraft battery towers complete the defense system. The cells dug under sea level open directly onto the roadstead. The workers worked away from the waves thanks to a dam temporarily erected in front of the construction site. The entrance to the basins is protected from torpedoes by a network of cables fixed on the hulls of the Strasbourg and the Crapaud, old warships intentionally sunk in front of the cavities whose wrecks are still visible today.