
Like all the fortified works of the Second World War, the construction site is led by the Todt organization, a civil engineering organization created in 1938 by Hitler and directed by one of his relatives, the engineer Todt. 500,000 m3 of concrete are needed to build the base. The construction site is therefore particularly hungry for sands, extracted locally, in metals used for reinforcement and transported from Germany, in wood taken from the surroundings to make formworks. The entire region is organized around the construction and operation of the base: the railway tracks are extended to allow the transportation of materials. The mansions and castles are requisitioned to house the submarine officers. More than 15,000 men work on building the base. Half of them come from occupied Europe and North Africa and are housed in camps; the other half is composed of French people hired by French construction companies.