
The originality of blocks K1 and K2 lies in their location about 200 meters from the sea. The alveoli not opening onto the water, an inclined ramp, the slipway, is arranged in K1 to hoist the submarines. Placed on a ber (metal support) using overhead cranes, the submarine is towed by a winch up the ramp. At the exit of the slipway (metal support), a cart-tractor is attached to the cradle and pulls it on the translation platform (on which the Flore rests today). This one moves on rails between the two blocks to place the submarine facing a socket. Then the cart pushes the berth into the socket where the submarine is repaired. The release follows the reverse process. About twenty men are working to carry out this maneuver which lasts almost an hour. The location of the translation platform rails, partially filled since 2012, is now marked by a red coating. The two bunkers now host a dry port that is returning to its original use as well as shipbuilding companies taking advantage of the gigantic configuration of the buildings.