On December 23, 1940, Hitler approved the plans for the Keroman base drawn up by Admiral Doenitz and Engineer Todt. In February 1941, two projects were carried out in front of each other: on the fishing port, two Dombunkers, enormous naves with ogival shapes, were built to house the submarines hoisted out of water by the slipway. At the same time, Keroman 1 (K1) is erected in eight months. The latter measures 120 meters by 120, is 18.50 meters high and supports a roof about 3.50 meters thick. It includes the channel of a slipway and 5 cells closed by imposing armored doors with two leaves. The construction continues from May to December 1941, with the construction of Keroman 2 (K2) . Slightly larger (138 meters long by 128 meters wide), it has a barracks for 1,000 men, a storage space for the transhipment cart and 7 repair cells.