
This canal, measuring 53 km long, has been the subject of a long process of reflection and design. Started in 1792, the canal will be put in water a century later, in 1914. To develop human presence and economic activity in the Alpilles, it was important that a hydraulic network irrigate the territory and allow agriculture to develop. This canal alone feeds the southern part of the massif.